 Which items should be taken into consideration when subject is crane?

1- IN CONSTRUCTION DESIGN
If the building or the installation is on the design stage, together with the choice of the most suitable crane type and loading capacity according to your requirements, construction type of the building, columns, girders, headroom heights, consoles, transport loading gauges, distance between continuous columns are very important dimensions or data. At that stage, it is necessary to be in contact with the experienced crane manufacturing firm or firms and to be informed. Industrial estates, cooperatives, business centers, factories, buildings generally are not behaved sufficiently scientific. They don't take into consideration the above mentioned subjects or are content with the project which is prepared by the architect or civil engineer. So as a result, when the work reaches to the stage of  crane manufacturing and assembly, generally lower headrooms, wrongly chosen console dimensions for the overhead cranes and  narrow or wider spaces then necessary space through which the overhead crane should pass will be obtained. The loading doors which are located in the same vertical line, wrongly dimensioned steel doors and steel constructions, which are often occur in the high business centers are also included.

Any scientific study is not performed  for the cranes and industrial elevators which will be used in material transfer between the flats in the same building and also handling the load from trucks to inside the building and distribute to the flats. All in all, there will be errors or inadequate conditions in front of crane manufacturing firm. As a result, due to these facts,   refraction of concrete blocks between flats, reconstruction of  steel legs or rebuilding of concrete columns and walls will be often needed after finishing the building. Another remarkable point is that, the need to scrape pit bottom of industrial elevators. But, in the same foundation, the main constructive carrying devices of the building pass.

2- IN EXISTING BUILDING
If the building has been completed, next step is to choice of the most suitable crane or lift according to the customer's requirements and working conditions. This choise is very easy and without any problem, if there is not any error in the construction and dimensions of the building. But, the problem is to produce solutions, in case of  error or errors exist in the building,

Bayursan can produce solutions even in the most difficult conditions due to the its wealthy of quite a wide variety of productions, scientific approach and experience related to long years. In general, approaching of hook block to the headroom and side walls as close as possible, going out of the building as far as possible are needed or required. The lifting machines are also needed to be able to take loads not only in vertical direction, but from left and right within a specified angle. Curved rails, cranes carrying their own rails, folding rails, power feeding systems, control systems and types are all evaluated in this frame.